Work party report 11th March 2018

Work party report 11th March 2018

Dave Rolfe and I were on site today. It was more of a sorting stuff out day than doing much actual work as it was my first day back since December. I did manage to clean off the sixth radiator fan resistor backplate and undercoat the second side of two that weren't done last time, and I grabbed a picture of the completed fan roof underside now it's had the small pipes and rubber draught strips attached. The radiator compartment itself has had the four new drain pipes welded in and the draught strips attached along the floor and by the cab doors.

Radiator fan roof panel nearing completion of refurbishment.
New share certificates issued
Radiator lift April 2018