RRRG new website top logo resized

 

Restoration diary

Reports of restoration work on 50029 and 50030.

I am the RRRG Chairman and co-webmaster.  My posts will deal with work on site, Group news and developments.

AGM

RRRG are holding their Annual General Meeting (AGM) this coming Sunday 24th June 2012 commencing at 13:30 hrs at the 260th Birmingham Scout Group, rear of Scanlons Club, 254 Spring Road, Tyseley, Birmingham B11 3DW.

Current members and shareholders are very welcome to come along and attend to find out how the work on 50029 and 50030 is progressing.

Any non-members are also welcome to attend but would need to become a member or shareholder: this can be arranged on the day.

Tags:
Continue reading
4729 Hits
4 Comments

Nene Valley sales stand stock logistics

After work on the evening of Monday 2nd April Mark and I drove miles and met up off J18 M1 to transfer more stock to me for the Nene Valley Railway Tornado and Thomas event. We have accumulated a lot of steam and generic railway stock over the years and beefed up our toy offering so I saw this as a great opportunity for RRRG and the Nene Valley Railway were happy for us to attend and publicise our attendance.

We also spent an hour discussing a number of RRRG challenges.

Another long drive partly through some new roads to me around Naseby on a pleasant evening saw me somewhat tired but managing some attention for Jack the dog and Frankie and Bella the rabbits before bed to be fresh for the commute and work tomorrow.

 

Continue reading
6378 Hits
0 Comments

Nene Valley sales stand stock logistics 2

On Wednesday 5th after work I met up with the Fifty Fund to collect more stock.

We sell stock supplied by the Fund to increase the variety of our offering and we share the profits.

We also spent an hour trying to help each other with the constant challenges of Class 50 preservation groups.

 

Continue reading
4053 Hits
0 Comments

Workparty March 25th 2012

Dave was on site all weekend working on cleaning and painting one of the bodyside radiator grilles.



Ian and Pete with some assistance from Dave continued working on the ex-50008 engine replacing some of the head covers.



Steve and Sarah assessed traction motor contactor arc-chutes so spares and paxolin to replace missing parts can be ordered.



The long process of verifying all the cables from the electrical cubicle to equipment in 50029 was started. Each cable was to be tested with a multi-meter to confirm continuity. The first cables checked were those from terminal bar TB6 with blower No1 cables testing out ok. Problems were then encountered as we checked Blower No2 but could get no reading and eventually realised this was because the cables and flexible conduit had been cut about an inch from the connection box.



As it is too difficult to pull any slack through we have decided to dismantle the conduits with a view to reinstalling via a shorter route up the front of the blower negating the need to replace the cables.

Continue reading
5551 Hits
1 Comment

KV10 news

Preliminary discussions have been engaged in with a good contact who can overhaul KV10s.  RRRG has a good number of both KV10s and their control cards in our possession but we have no idea if any or all of them are actually serviceable!  For the uninitiated, a 50 has two KV10s: one controls the main generator field strength and the other the ETH generator field strength - the difference being the control cards in the KV10 which define its function (main or ETH generator).  We understand this same contact can overhaul CU1 control units (the "master brain" of a 50) and we hope to have more news on these electronic component overhauls in a month or so.

Continue reading
4863 Hits
1 Comment

Work at Rowsley 4/5th February 2012

I had the day off work on Friday. Dom worked an early half day in Theale and drove from Reading to Peterborough.

Technical Officer Chris Thorn had prepared some tasks for Dom, new volunteer Mike Backler and I to get our teeth in to for the next few months. This involves grinders with wire brushes so goggles are essential. However fogging up is a real pain. I therefore went to B&Q then Screwfix in search of some fog-free goggles. I bought two different pairs to test.

After arriving for lunch, Dom and I ventured to Tesco to buy supplies for the weekend and the accommodation/ mess coach BG1 generally. After unloading; our mascot Jack (black and white 4 year old russell/ collie cross) persuaded us to go to the Palmerston Alms in Woodston to meet Uncle John Pinion, fellow RRRG member, for refreshments.

Saturday found us delayed for the morning in Peterborough trying to sort out bringing Renownrepulse.com back from the dead. We spoke extensively to Dan Horton in Ripon who is going to host the new site. We also tried three different ways of getting a backup to him. We then loaded the car and set off about 1400 arriving at a snow covered Rowsley South 1615.

Dave Rolfe had arrived earlier on Saturday. It was -2c when he left Stourbridge but -7c on arrival at Rowsley. BG1 and BG2 doors were frozen and there was ice inside BG1. We transferred our stuff from the car to BG1 and set out our bedding in preparation for a very cold night. Dave had not brought non-work clothes so did not join us for the tramping through snow in to a fierce sleet blizzard on the footpath to the Church Inn at Darley Dale. Mike and his partner Lynne joined us for a few drinks while we discussed Mike's interest and our plans. The Shalimar at Rowsley kindly braved the snowdrifts to pick Dom and I up to invest in their fine cuisine. This set us up nicely for a short tramp through four inch deep snow to our beds.

Dave, Dom and I were up with daylight for breakfast and getting cracking on a number of jobs. My car read -5C but it was dry becoming sunny. Andy Rowlands, Mark Burrows, Ian Kemp, Peter Carter, Steve Tripp and Sarah McColl decided the road conditions were two hazardous to attend. Peak Rail had also decided to abandon services. The weather clearly put off other groups as for some of the day we were the only people on site. Rob Sanders did turn up with a signalling volunteer and they collected offcuts in order to assemble a staircase for the nicely restored signal cabin now resident at Matlock Riverside.

Dave showed us where the grinders, brushes and brake rigging were for us to remove for attention. I cleared the external work bench of snow and set up extension cables and the grinders. Mike arrived at 0930 and I showed him the ropes. Dom and Mike then spent most of the day removing these very heavy cast parts and brushing off rust and brake dust. I found drills and grinding stone bits and hand wire brushes and I cleaned up the bits the others could not reach. I also did the washing up, cleaned the worktop and removed the rubbish in an effort to discourage the mouse we have attracted recently.

Dave set off to vacuum out some underfloor areas in Repulse but could not as the dust had frozen! Instead he undertook some adjustments to a door on BG2 and took apart a hydraulic press in order to modify the better one we have acquired recently.

Mike says he enjoyed his first day with us and if any of our volunteers are up during Monday to Fridays then let me know as he may come along otherwise our next larger gathering is due for 25/26th February. Dave however will be up most Saturday and Sundays if anyone would like to join in.

We had some entertainment at the end of the day when my car battery was too weak to start the engine. We found jump leads but it refused to take a charge. We improvised a tow rope and Dave's 4-wheel drive pulled us out to Harrison Way and on the second attempt of bump starting BiG 06 WenDY fired, complained and started. Relief!

'Til next time. Tim

 

 

 

 












Chilly Repulse RRRG area under snow

 

 

 

 

 










The wilderness at Rowsley, looking south


Birch forest at Rowsley - winter wonderland!
Continue reading
6538 Hits
1 Comment