Work party report 8th January 2023

​Mark and Robert Burrows, Jay Hirst and I were on site yesterday. Mark and Robert barred the power unit round, rotated and oiled the four turbos, then did some more cleaning and scraping off loose paint around the electrical cubicle. Jay and I searched for the brake frame electrical conduits in our storage, finding mos...
Continue reading
1336 Hits
0 Comments

Work party report 27th November 2022

Work party report 27th November 2022
Refurbished pipework reinstated inside 50030.
Aluminium trim strips being reinstated in no 1 end cab of 50030 along with a reinstalled driver's switch panel.
Dave Rolfe, Jay Hirst, Carl and Sofy Looker plus myself were on site on Sunday. Dave was continuing fitting various pipework in the radiator and engine compartments of 50030. Jay and I fitted the switch panel above the driver's seat in No.1 cab. We fitted some of the aluminium trim strips, but still need to find several other pi...
Continue reading
1564 Hits
0 Comments

Work party report 13th November 2022

Work party report 13th November 2022
Wiring in the no 1 end cab of 50030 seen in November 2022. Photo by Andy Rowlands.
Engine compartment water pipes reinstalled in 50030 in November 2022. Photo by Andy Rowlands.
Jay, Dave and I were on site today. Dave has been busy refitting various water pipes from the radiators that go through the filter compartment to the power unit. Jay helped me reconnecting the cables to the cab switch panel above the driver's position at no 1 end, but we lost the light before we could fix the panel in place.
Continue reading
1516 Hits
0 Comments

Work party report 18th September 2022

​Dave Rolfe, Jay Hirst and I were on site today. Dave was refitting fuel and water filler valves he'd perviously removed, cleaned & painted. Jay and I reconnected the cables to the fuel lift pump and alternator. The cables had all been cut off long ago, so each one was extended with a through-crimp and new ring crimp. The through-crimps we...
Continue reading
1484 Hits
0 Comments

Exhausters and blower motor lift 16th August 2022

Exhausters and blower motor lift 16th August 2022
A further big step forward in the restoration of 50030 was on Tuesday August 16th 2022. The traction blower motors and vacuum brake exhauster were lifted out of Repulse to allow the areas behind them to be cleaned and repaired if necessary. At a later date we will put back overhauled electrical machines which we acquired separately from the on...
Continue reading
1512 Hits
0 Comments