RRRG new website top logo resized

 

Restoration diary

Reports of restoration work on 50029 and 50030.

Work party report 10th December 2023

Work party report 10th December 2023
Mark Burrows, Dave Rolfe, Richard Dale, Jay Hirst and I were on site today. Mark was only there a couple hours, to show a visitor around the project. Dave was continuing to overhaul valves for the braking system. Jay fitted rubber strips behind the last air filter frame, then assisted me wiring the four brake valves on the brake frame. Richard...
Continue reading
1438 Hits
1 Comment

Work party report 26th November 2023

Work party report 26th November 2023
Jay Hirst, Mark Burrows, Richard Dale, Dave Rolfe and I were on site today. Mark was unable to stay beyond noon, so he barred round the power unit two revolutions, and oiled the turbos. Jay carried on guing rubber strips behind where the air filter frames sit opposite the electrical cubicle. Dave was fitting the last of the airpipes he had recovere...
Continue reading
1105 Hits
0 Comments

Work party report 23rd July 2023

Work party report 23rd July 2023
​Dave Rolfe, Mark Burrows, Richard Wade, Jay Hirst and I were on site today. After barring round the power unit and oiling the turbos, Dave and Mark began investigating the broken air pipes I'd discovered under the floor in No.1 cab, finding virtually all those that dive through the plating under the cab floor had corroded away, on both t...
Continue reading
1365 Hits
0 Comments

Work party report 9th July 2023

Jay Hirst, Richard Wade and I were on site today.We fitted and reconnected the driver's side tail lamp unit, not the easiest of tasks, as access to put the nuts on the bolts is difficult under the driver's desk. We then belled out and marked all the wires from the change-end switches in both cabs. The mounting plates that hold the change-end switch...
Continue reading
1076 Hits
0 Comments

Work party report 25th June 2023

Work party report 25th June 2023
Dave Rolfe's testing rig for brake frame valves. Photo by Andy Rowlands.
One of our driver change-end switches. Photo by Andy Rowlands.
Jay, Richard, Dave, Mark and I were on site today.Dave has been continuing to identify and clean sections of pipework for the brake frame. He has also devised a test-rig for testing various valves to see which ones work. Mark could only stay until midday so he barred the power unit round and oiled the turbos. Mark had brought one of the change-end ...
Continue reading
1438 Hits
0 Comments

Work party report 19th March 2023

Brake frame valves newly installed into 50030. Photo by Jay Hirst.
Brake frame junction box and wiring completed. Photo by Andy Rowlands.
Brake frame overview as work on the rebuild continues. Photo by Andy Rowlands.
​Dave Rolfe, Jay Hirst and I were on site today. Dave has been retrieving more sections of air piping and valves from store, cleaning, overhauling and test-fitting them inside Repulse. Jay and I completed assembly of the upper section of the brake frame conduits, and finished installing the new wiring.
Continue reading
1402 Hits
0 Comments

Work party report 19th February 2023

Work party report 19th February 2023
Dave Rolfe, Mark Burrows, Jay Hirst and I on site today, plus returning member Wayne Boyle. With photos I'd got of a complete 50, Dave continued to find, clean and paint parts for the brake frame. Mark investigated the smaller airpipes on the brake frame in Renown, which is more complete than what's in Repulse, to help identify what we ne...
Continue reading
1588 Hits
0 Comments

Work party report 5th February 2023

Work party report 5th February 2023
​Dave Rolfe, Jay Hirst, Mark Burrows and I were on site today. Mark barred round the power unit and oiled all four turbos again. Dave and I hunted out the big air pipes for the exhauster under the brake frame, finding most of what we need. The rest we either haven't found yet or is missing. Dave then set about cleaning the secti...
Continue reading
3282 Hits
0 Comments

Work party report 22nd January 2023

Work party report 22nd January 2023
Mark and Robert Burrows, Dave Rolfe, Jay Hirst and I were on site last Sunday. Mark and Robert barred the power unit intended for 50030 round again, then did more scraping and cleaning below where the exhauster and motor blower sit at No.2 end. Dave continued working on cleaning and painting various sections of pipework. Jay and...
Continue reading
1356 Hits
0 Comments