RRRG new website top logo resized

 

Restoration diary

Reports of restoration work on 50029 and 50030.

Cab restoration and electricals update

Cab restoration and electricals update

Recent work in the cabs of 50030 has been concentrating on freeing off the power controllers.  Ian Kemp and Dave Rolfe have sprayed them liberally with WD40 and worked them backwards and forwards.  As a result they move for the first time since 1992, albeit rather stiffly in the case of no 2 end controller at the moment.  Andy Rowlands fitted, tightened up and reconnected the cables on the replacement set of contacts Dave had removed from one of our spare power controllers, to replace the set found to be broken during our freeing-off of the controllers. To achieve this you need to unbolt the plate that holds the sets of contacts so it swings away from the cams, and refitting the bolts that hold the plate is difficult as the contact springs keep pushing the plate away from the cams, which makes it not the easiest job when hunched up under the driver's desk and you need three hands!

The controller in no 2 cab is still quite stiff despite repeated applications of various lubricants, but the one in no 1 cab is much easier to move. If we cannot make them easier to rotate, we may have to look at removing the entire controller pedestals and dis-assembling them totally to see if the nylon bearings need replacing.

 

b2ap3_thumbnail_No-2-end-power-controller.jpg

 

Ian and Peter Carter oiled the main big end bearings and barred the engine round.  Andy Rowlands has also been working to refit the reverser air piston in the electrical cubicle of 50030.

 

 b2ap3_thumbnail_Fitting-reverser-air-piston-1.jpg  b2ap3_thumbnail_Fitting-reverser-air-piston-2.jpg
Continue reading
6277 Hits
1 Comment

New CU5 radiator fan control unit completed

New CU5 radiator fan control unit completed

Adrian Spencer of the Cotswold Mainline Diesel Group, a good friend and contact of RRRG, volunteered to construct a modernised version of the CU5 control unit for use in 50029 and 50030, as RRRG has none and these items are rarely made available for sale by other groups.  The work to build one unit has now been effectively completed barring minor cosmetic details such as securing the wires to the circuit boards with cable ties.  The replacement unit has been deliberately designed to physically resemble the old unit as much as possible such that it will be easy to mount into the existing space in the electrical cubicles.  However the insides employ a modern microprocessor to replicate the functions of the original unit - this is necessary because the original Norlog integrated circuits are no longer made and no modern equivalent apparently exists.  The original unit contains many auxiliary components which aren't necessary in the new build because the microprocessor duplicates their respective functions.  Three printed circuit boards on the old unit are reduced to one in the new unit.  A number of diagnostic LEDs are included to indicate which contacts are closed at any given time - this will enable the correct functioning of the new unit to be monitored.  The new unit also employs optical connections to isolate it from interference from other cubicle equipment.

 

b2ap3_thumbnail_CU5-new-build-6-Oct-2013.JPGb2ap3_thumbnail_CU5-new-build-7-Oct-2013.JPG

 

The CU5 radiator fan unit basically decides when to increase the speed of the radiator fan, and depends on the temperature of the power unit cooling water. The fan initially runs at a low speed, and the CU5 switches in three faster speeds as the water temperature increases, via banks of resistors in the roof of the passageways past the radiators, placed there to keep them cool. The programming of the microprocessor in the new unit can be altered if it turns out not to perform as the original did.

 

b2ap3_thumbnail_New-and-old-CU5-Dec-2014-A-Spencer.JPG

Continue reading
6584 Hits
0 Comments

Work party report 5th October 2014

Work party report 5th October 2014

Ian, Pete and Dave spent the day unfastening the bolts to allow the main generator fan to be removed.  The fan is between the generator and power unit (but bolted to the main generator itself) and is normally hidden by the surrounding cowling. It sucks in cold air from under the body to help cool the gen and the cowling keeps the air circulating round the gen rather than blowing it all round the engine compartment. It has to come out to give access to the next layer of bolts that actually connect the engine to the generator. This proved to be a very fiddly task in the limited space between the fan and engine block.  Ian is seen proudly displaying his dirty hands after the day's work!

 
b2ap3_thumbnail_004.JPG
 
I continued cutting and fitting the cubicle air circuit, with the same difficulties as before, today was the turn of the field divert contactors. The pipe itself is easy to bend and the olives go on fine, it's getting my hands and a spanner to the connections round all the cables that's the problem. I should have done these pipes first before cabling, but as ever, wise after the event.
 
b2ap3_thumbnail_003.JPG
Continue reading
5546 Hits
0 Comments

Work party report 21st September 2014

Work party report 21st September 2014
Dave, Pete and Ian disconnected and removed the four sections of airshaft round the power unit flywheel and bolted up the second intercooler, which Dave then painted. I continued cutting and fitting cubicle air pipes, removed the Z23 resistor and a now-redundant cable from it to the CU6, in preparation for fitting an electronic device in its place as part of the CU6 upgrade.
 
As we were packing up we were greeted by the sound of eight Rolls Royce Merlins as both the preserved airworthy Lancasters flew over Rowsley.
Continue reading
6739 Hits
2 Comments

Work party report 7th September 2014

Work party report 7th September 2014

Mark brought two of the refurbished KV10s, paperwork, test sheets and circuit diagrams up to site. After a test fitting they were removed once again! Dave, Pete, Ian and I hoisted one of the intercoolers up onto the ex-50008 power unit and bolted it in place. The other is ready to be refitted but needs painting first. Dave started making a hoist arm to be fitted on a corner of the container over the workbench. I started fitting the cubicle air circuit pipes, which was somewhat difficult with all the cabling in place, so if I ever do that again, the lesson is fit the airpipes before the cabling, then the cables wouldn't be in the way!

The new airpipes are just visible in the photo below, between M4, M5 and M6.

I discovered the air connections on the reverser air cylinder are a different thread to all the others, so I brought it home with me to take to the supplier I got the other fittings from to see if they can provide the correct-thread fittings for it.

 

b2ap3_thumbnail_AMR-07-09-2014-008.JPG

Continue reading
5205 Hits
0 Comments

Work party report 24th August

Work party report 24th August

A good day on site today. Former regular working member Wes Needle joined us for today's workparty.  Since getting married and starting a family, Wes hasn't had much time to indulge his chosen hobby, but because they had taken a break in a holiday cottage not far from Rowsley, he was able to take a day to join us while his wife Keren and the nippers went on the train.

Dave Rolfe continued cleaning and painting power unit pipework, then he, Wes, Peter Carter and Ian Kemp finished overhauling one of the intercoolers and reassembled it. They also started unfastening one of the compressors on 50030 ready for it to be removed as there is an overhauled one ready to take its place.

 

b2ap3_thumbnail_052.JPGb2ap3_thumbnail_053.JPG

 

I located the fittings and tubing I had purchased some time ago to replace the air circuit in Repulse. There are different threads that have been used on these fittings at various times, so it was a bit of a gamble whether we had chosen the right thread, but fortunately when I tried the fittings in the motor and divert contactors, they screwed in fine. I had made a diagram some time ago of the routing and connections of the air circuit in 50021, so I am now able to copy it in Repulse. I also finished off connecting up the newly-fitted reverser in the electrical cubicle of 50030 with all its wiring and connections.  Even the weather was kind to us!

 

b2ap3_thumbnail_060.JPGb2ap3_thumbnail_059.JPG

 

Continue reading
5269 Hits
0 Comments

Work party reports 29th June and 14th July

Work party reports 29th June and 14th July

On 29th June a long-running sub-project within the electrical restoration of 50030 took a substantial step forward. I got the proper reverser (Class 50 specification) fitted into Repulse, with help from Dave Rolfe, Peter Carter and Ian Kemp as it's so damned heavy. We had to jiggle it about to get it to fit properly, but did it in the end. I attached the divert cables at the rear, but didn't have time to do the auxilaries at the front as I showed two visitors round Repulse. We are always happy to show enthusiasts around our project so if you want to take a look inside our locomotives then get in touch with us either via the website or our Facebook pages and we will do our best to accommodate you.

 

 

b2ap3_thumbnail_086.JPG b2ap3_thumbnail_083.JPG

 

 

Also on this date Dave, Ian and Pete also continued sorting fuel and water pipework recovered from 50030's power unit to replace damaged sections on the ex-50008 unit.  This unit is destined for use in 50030 when complete - the existing power unit in Repulse was in acceptable condition when we acquired the loco, but has high engine hours and as part of our policy of overhauling our 50s to a very high standard in order to give them a long and trouble-free career in preservation we decided to overhaul one power unit totally.  The existing unit in Repulse will be re-used inside 50029 because the engine in Renown has serious problems following the seizure which ended the loco's BR career.  We don't know for sure but are aware of the possibility that the unit in 50029 may only be usable as a source of spares.  Power unit work can be one of the most gruelling of the practical restoration projects as the same task often has to be done at least sixteen times, sometimes even 32 or 64 times!

 

b2ap3_thumbnail_081.JPG b2ap3_thumbnail_079.JPG

 

On 14th July I attached the reverser auxiliary contact wiring after showing another visitor round Repulse. Meanwhile, Ian, Pete and Dave fitted the fuel feed and return pipes to the ex-50008 power unit that they had previously salvaged from the power unit inside Repulse.

 

Continue reading
6742 Hits
0 Comments

Work party report 15th Jun

Work party report 15th Jun

As it rained almost all day yesterday, even though the forecast was for dry weather, I decided not to cart the reverser outside as I've cleaned it, so I test fitted the newly-made CU2 field divert and CU7 ETH detector units into 50030's elec cubicle. While the CU7 can go in its original position, the original position for the CU2 had the cable connections very close to the cubicle frame, so I drilled a couple more holes to put it in a better position.
 
Inbetween the heavier bursts of rain, Ian and Pete removed the fuel feed pipes from 008's power unit as they'd been bent during the lift at Crewe when we bought and moved the PU about 8 years ago. Dave was painting pipes taken from the PU inside Repulse to replace them.
 
I also took the opportunity to get some more pictures of Mark's work last weekend on the generator conduits.
b2ap3_thumbnail_Gen-conduits-2-June-2014.JPG

Continue reading
5227 Hits
0 Comments

Work party report 7th June

Work party report 7th June

Dave Rolfe and I had a very wet Saturday at Rowsley last weekend (I'd gone on the Saturday as Sunday was my Wedding Anniversary), the weather finally cleared around 5 o'clock!

Given the weather we both found things indoors to occupy ourselves, Dave spent part of the day unbolting and freeing off sections of the radiator louvre operating mechanism. His remaining time was spent sorting out the various fittings, clamps, etc, that are needed to refit the fuel rails to the power unit, and checking their condition, cleaning and painting the metal sections of the clamps. I spent most of the day in 50030's generator room sorting out the best sections of conduit, from our collection of bits ex-50023, 50030 and 50040, to make up the remaining set of conduits. By the end of the day, I had cut sufficient sections to lay out the last of the conduit runs, all that remains to do now with this job is to strip the years of paint and dirt off them, thread the ends of the cut sections and fit the relevant couplers and locking nuts. Hopefully another day's work should see the conduit conundrum resolved. In the process I also identified ¾ of a set for one side of 50029.

Continue reading
6710 Hits
1 Comment

Work party reports 25th May and 1st June

Work party reports 25th May and 1st June

If you've been following RRRG for some time, you might know that we have in our spares stock a genuine Class 50 reverser and a Class 37 example, which is similar but not identical to the Class 50 part.  We had removed the genuine 50 reverser in order to use it as a template to modify the 37 item to Class 50 spec, and in the meantime the ex-37 reverser was installed in 50030's electrical cubicle so that I could judge how long to make the wiring whilst rebuilding the cubicle.

b2ap3_thumbnail_37-reverser.JPG

On Sunday May 25th I disconnected the main cables from the back of the ex-37 reverser, and with Dave Rolfe's help, got it out of 30 and into the container. I cleaned the main power contacts on the the proper 50 reverser and labelled each contact bar while Dave was finishing drilling out sheared bolts around the removable grille that gives access into the No.1 end clean air compartment. Whilst cleaning I happened to notice the auxiliary contact blocks appeared to be facing the wrong way, so I went to Washwood Heath during the week to check 50008 Thunderer, and found they had indeed been refitted the wrong way round after we had taken them apart to make a replica second set to modify the 37 reverser for use in 29.

b2ap3_thumbnail_37-reverser-out.JPG

Whilst working around the cubicle area in 50030, I was impressed by work that Mark Burrows has been doing to restore the cable conduits for the traction cabling to the main generator.  This has been a laborious task using the best parts of conduits salvaged from 50023 and 50040 before those locomotives were scrapped a few years ago.

b2ap3_thumbnail_gen-conduits.JPG

On 1st June Ian, Pete and Dave refitted the decompressor plugs into the power unit, then spent the rest of the day cleaning parts of the power unit ready for painting.

b2ap3_thumbnail_PU-work-1-June-2014.JPG

On the same day, I removed the auxiliary contact blocks from the Class 50-spec reverser and fitted them the right way round, in the process realising that the internal cams had been rotated out of their correct positions, so they wouldn't open and close in the correct sequence. The afternoon was spent getting them back into the correct alignment.  Now that the reverser has been properly adjusted, my next task will to fit it back into the electrical cubicle in 50030.

b2ap3_thumbnail_50-reveser-cleaned.JPGb2ap3_thumbnail_50-reverser-aux-contacts-corrected.JPG

Continue reading
6658 Hits
2 Comments

Radiator mounting nuts

Radiator mounting nuts

No, we haven't packed up and ceased to exist.  Yes, we have been a bit quiet.  Sorry about that - normal service to be resumed but a number of us have had things other than RRRG to deal with and our day lives have got in the way.

 

Ian Kemp and Dave Rolfe decided today to tackle a job we started some time ago but ended up leaving to another day.  This was to remove the remaining radiator securing nuts, so that we can lift the radiators out of 50030 and have them sent away for overhaul.  Given that the radiators were most likely last removed at refurbishment in the mid-1980s it goes without saying that the fastening nuts were stuck on very firmly indeed.  We had previously managed to remove three of them, leaving five left to do.  A potent combination of elbow grease, tools (and broken tools), purple language and in the case of one particularly stubborn nut, chiseling has now freed all eight nuts and the radiators can now be lifted out.  It's the seemingly little tasks like this that end up taking so much time.  Photos courtesy Ian Kemp.

 

b2ap3_thumbnail_DSC_0154.jpg b2ap3_thumbnail_DSC_0156.jpg

Continue reading
10304 Hits
0 Comments

New merchandise available!

New merchandise available!

Just in time for Christmas shopping season, RRRG is pleased to offer a number of new lines of merchandise.  We now have fleeces, polo shirts, new designs of t-shirts and mugs plus keyrings and phone cases!

Don't forget our other merchandise such as mugs and t-shirts or Hornby models!

 

b2ap3_thumbnail_RRRG-fleece-green.jpg b2ap3_thumbnail_Polo-shirt-bottle-green.jpg
b2ap3_thumbnail_Fleece-logo-small.jpg b2ap3_thumbnail_Polo-logo-small.jpg
b2ap3_thumbnail_RRU-two-loco-t-shirt.jpg b2ap3_thumbnail_50029-photo-mug.jpg
b2ap3_thumbnail_iphone-case.jpg b2ap3_thumbnail_Renown-keyrings.jpg

 

Also, please don't forget our 2014 calendar.  All these items are important fundraisers for RRRG!  They would make great presents for someone or even yourself - maybe that distant relative needs some suggstions about what to get you for Christmas?!  Point them towards the online shop at renownrepulse.com or This email address is being protected from spambots. You need JavaScript enabled to view it. if you need shopping assistance.

 

b2ap3_thumbnail_small-00-Front-replacement.jpg

Continue reading
13741 Hits
0 Comments

Nene Valley Railway Winter Tornado gala - sales stand!

Nene Valley Railway Winter Tornado gala - sales stand!

With many thanks to the Nene Valley Railway for inviting us, RRRG will be operating our sales stand at Wansford station during the the Winter Tornado gala this coming weekend (2nd and 3rd November).  Any railway enthusiast must acknowledge the sheer achievement that the successful completion of 60163 Tornado represents and we are proud to help support the A1 Steam Trust as their locomotive stars in what should be a very good event.

We have recently taken delivery of a chip and PIN credit card terminal, allowing us to take credit card payments easily on the sales stand.  This aplies not just to this event but to all future sales stand operations.  We believe this flexibility in accepting payment, coupled with our keen prices, will make our stand even more appealing to our loyal customer base.  We look forward to seeing many of you over the coming weekend.

b2ap3_thumbnail_We_Accept_Visa_Mastercard.jpg

Continue reading
14028 Hits
0 Comments

CU5 replacement under construction

CU5 replacement under construction

One of the electronic control units in a Class 50 locomotive is the CU5 radiator fan control unit.  It works together with the CU4 coolant flow control unit under the control of the CU1 main control unit to maintain the correct cooling water temperature by adjusting the speed of the radiator fan.  Both RRRG's locomotives are missing this unit.  The original was designed by Hawker-Siddeley for English Electric and utilises components that, by the standards of the 21st century, are thoroughly obsolete.

A good friend of RRRG, based at the Gloucestershire and Warwickshire Railway, offered his services to construct a compatible replacement unit using modern electronics - needless to say, we were and are extremely grateful for this offer!  Shown here is the item which is now nearly complete.  The main circuit board has been deliberately left unattached to the case at this stage, as the next step is to test the unit by connecting to a suitable 110 volts DC source in order to ensure it performs correctly.

An original unit was borrowed from the 50021 Loco Association, and this new unit has been produced to resemble it physically, while using greatly-simplified circuits (as the original was over-complex for what it needed to do), modern components and utilising a small programmable microprocessor to replicate many of the functions of the original.  We will provide more updates on this sub-project when they become available.

 

b2ap3_thumbnail_CU5-new-build-5-Oct-2013.JPG b2ap3_thumbnail_CU5-new-build-6-Oct-2013.JPG b2ap3_thumbnail_CU5-new-build-7-Oct-2013.JPG
Continue reading
17401 Hits
0 Comments

Have you got your 2014 Class 50 calendar yet?

Have you got your 2014 Class 50 calendar yet?

Our A4-sized appointments calendar Class 50s Now and Then is still available from our online shop!  Priced at £6.95 plus P&P, each month features important dates in Class 50 history such as dates of introduction or namings.  The calendar is produced to the same high quality finish as the Rail Photoprints/Platform 5 series.  October 2014 features shots of 50015 Valiant at Bury Bolton Street station in a night shoot at the East Lancashire Railway in January 2011 by Mark Burrows and in Dutch livery at Hereford in 1991 by Chris Holland.

b2ap3_thumbnail_small-10-October.jpg

Continue reading
9783 Hits
0 Comments

Rebuilt CU2s are delivered!

Rebuilt CU2s are delivered!

Following on from news and developments earlier this year on the work we have commissioned to build two CU2 field divert units for use in 50029 and 50030, we can report with great pleasure that this project reached a successful conclusion today.  Our contractors invited 50030 Electrical Officer Andy Rowlands to view the rebuilt units, and demonstrated as the relay in each unit was energised and gave output to the correct terminals.  Each unit was tested multiple times with no problems arising.  We were pleased to note that our contractors have managed to replicate the original solder tracks from the sample unit supplied as the template.  Now that we have taken delivery, the units can be taken on site for trial fitting and cabling up, before being stored securely off site until such time as they are needed.  Photos courtesy of Mark Brown at IES.  This work has not been cheap and we would greatly appreciate the support of Class 50 enthusiasts either by joining RRRG and buying shares or supporting us via our online shop.

b2ap3_thumbnail_CU2-two-new-units-9-Sept-2013-Mark-Brown.jpg b2ap3_thumbnail_CU2-new-on-test-9-Sept-2013-Mark-Brown.jpg

Continue reading
11646 Hits
0 Comments

2014 calendar "Class 50 Now and Then" still available!

2014 calendar "Class 50 Now and Then" still available!

Don't forget that our 2014 calendar "Class 50s Now and Then" is still available priced at £6.95 plus P+P.  The image for September 2014 is one of 50035 Ark Royal in LoadHaul livery at Kidderminster station on the Severn Valley Railway together with a shot of the same locomotive in almost as-delivered condition and un-named, at Newton Heath Shed in 1975, photographed by Anthony Middleton and David Gray respectively.

September 2014 calendar image: 50035 at Kidderminster in 2013 and Newton Heath in 1975

Buy your copy now from our online shop: this project is an important fundraiser for us and we look forward to your continued support.

Continue reading
9045 Hits
0 Comments

Radiator louvres re-assembled

Fully overhauled and reassembled radiator louvre

Continue reading
7412 Hits
0 Comments

Radiator louvre slats and mechanism finished, donor electrical cubicle wiring loom progress

Radiator louvre slats and mechanism finished, donor electrical cubicle wiring loom progress

Work on site over the weekend of 13-14 June comprised efforts by Dave Rolfe to finish off the last set of radiator grille louvre frames and slats.  These have now been sanded and painted ready to reinstall into 50030 and will mean the locomotive has a fully overhauled set of radiator slats, together with the mechanisms for actuating and moving the temperature-dependent sets fully overhauled and operational for the first time in many a year!

b2ap3_thumbnail_IMG_1081.JPG b2ap3_thumbnail_IMG_1080.JPG
b2ap3_thumbnail_IMG_1078.JPG b2ap3_thumbnail_IMG_1079.JPG

Also on site were electrical officers Andy Rowlands and Steve Tripp, together with Sarah McCall the membership secretary.  They carried on with the donor electrical cubicle. Following recent progress with removing the control units, attention turned to the wiring loom which we also intend to salvage in order to replace the damaged wiring in 50029.  Initially the complexity of the loom and its many tentacles proved frustrating but Steve and Andy have devised methods for transferring it into Renown. All the cabling in all the side sections of the cubicle, namely that for KV10s, relays and control units, has been pulled out of the frame or into the middle section where it is more accessible.  One more visit should have the whole wiring loom out and hopefully soon into its new home in 50029.  We can then consider our options for the bulky frame of the donor cubicle which is taking up valuable space on site.

Continue reading
14919 Hits
0 Comments

Work party report 29-30 June

Work over the weekend of 29-30 June involved stripping and painting the last of the louvre mechanisms for the radiators in 50030, hopefully to be refitted in 2-3 weeks.  Photos to follow.

Continue reading
7462 Hits
0 Comments

2014 calendar is here!

2014 calendar is here!

We are delighted to announce that our 2014 calendar Class 50s Then and Now is available to order from our online shop.  The calendar has A4 sized pages bound in the middle to allow the month layout to drop down and reveal the accompanying photograph.  Each month features full page shots by noted railway photographers of a preserved Class 50 locomotive together with an inset of the same locomotive in its BR service days.  The calendar is available to order from our online shop, priced at £6.95 + P&P.  This production is a joint venture between RRRG and the Fifty Fund with proceeds going towards 50029 and 50030 as well as 50031, 50035, 50044 and 50049.  See below for page images of each month. The calendar is printed on high quality paper equivalent to the well-known Rail Photoprints/Platform 5 calendars and is of equal quality to these well-known publications. 

 

Month-by-month: Class 50s Now and Then 2014 Calendar
b2ap3_thumbnail_small-01-January.jpg b2ap3_thumbnail_small-02-February.jpg b2ap3_thumbnail_small-03-March.jpg 
b2ap3_thumbnail_small-04-April.jpg b2ap3_thumbnail_small-05-May.jpg b2ap3_thumbnail_small-06-June.jpg
b2ap3_thumbnail_small-07-July.jpg b2ap3_thumbnail_small-08-August.jpg b2ap3_thumbnail_small-09-September.jpg
b2ap3_thumbnail_small-10-October.jpg b2ap3_thumbnail_small-11-November.jpg b2ap3_thumbnail_small-12-December.jpg
Continue reading
11636 Hits
0 Comments

Spare electrical cubicle progress

Spare electrical cubicle progress

If you have been following RRRG for some time, you will remember that about a year ago we purchased and collected a number of spare electrical parts from the owners of 50021 Rodney.  Amongst these was the electrical cubicle originally in 50011 Centurion before that locomotive was scrapped.  Our reason for purchasing the cubicle was to use as a donor for rebuilding 50029's cubicle; as a rule of thumb the items that were removed from 50030 before we bought the locomotive were carefully unscrewed and the wiring in the electrical cubicle was in good condition.  The same cannot be said for 50029 unfortunately, with many of the cubicle wires having been cut.  To save the headache of pairing loose ends we aim to transplant the relatively intact wiring loom from the ex-Centurion cubicle into 50029.  That there were a good number of other components in the donor cubicle that would be useful for 50029 was a bonus.  The actual frame of the ex-50011 cubicle is however not in such good condition as the cubicle frame already in 50029: many of the catches for the doors are either bent or broken and it is obvious the cubicle has led a hard life since the locomotive it resided in was scrapped.  For this reason we cannot just swap the cubicles around between Renown and Centurion and a process of making one good one from two halves is necessary.

These pictures were taken on 9th June 2013 and show progress on the careful stripping of this cubicle and some of the parts we have recovered from it.  Electrical volunteers Steve Tripp and Andy Rowlands are shown at work but credit must also go to Julie Rollason and Sarah McCall for their invaluable assistance with this sub-project.

b2ap3_thumbnail_ST-cubicle-blog-image.JPG

b2ap3_thumbnail_AMR-ST-elec-cubicle-small.JPG


The complexity of the wiring loom is obvious from these pictures which show volunteers Steve Tripp and Andy Rowlands removing some of the last major components before we make a decision on how to tackle the wiring loom.  A good number of useful items have been recovered from this cubicle for re-use in 50029, as shown below.

 b2ap3_thumbnail_lighting-delay-timer.JPG  b2ap3_thumbnail_kv10-ex-50011-small.JPG

Shown below is one of the cubicle doors from the ex-50011 cubicle.  We have already refurbished the equivalent door and installed into 50030 and we have a better example in stock for 50029.  This is actually one of the better condition parts of the cubicle frame and speaks to the state that the ex-50011 electrical cubicle is in.

b2ap3_thumbnail_Rotary-switch-elec-cubicle-door-ex-50011-small.JPG

The next task is to assess the wiring loom in the 50011 cubicle and how best to remove it.  As the pictures show it is a many-tentacled monster and will require considerable thought as to the best way forward before we dispose of the frame of the 50011 cubicle.  With the size of the "thin man's passage" inside a 50 round the side of the electrical cubicle now not befitting our volunteers' physical profiles, we may also look to lifting the cubicle out of 50029 as a way of proceeding.

Continue reading
8699 Hits
0 Comments

Power unit restoration progress

Power unit restoration progress

Here are some photos from the ongoing restoration of the power unit we acquired from 50008 back in 2006.  This power unit is being restored with new internal components to restore it to effectively "zero hours" status and will be deployed into 50030 Repulse once completed.  The power unit currently inside 50030 will probably be reused in 50029 Renown in due course; the engine inside Renown suffered serious damage when the B4 cylinder seized.  This was the cause of 50029's withdrawal from BR service in early 1992.  The main generator on the ex-50008 power unit is in good condition as is that on the damaged block inside 50029; 50030 suffered a main generator flashover and we plan to perform a generator swap with 50029 at some stage to create a good power unit/generator combination.

b2ap3_thumbnail_photo-1.JPG b2ap3_thumbnail_photo-5.JPG

b2ap3_thumbnail_photo-2.JPG b2ap3_thumbnail_photo-3.JPG

b2ap3_thumbnail_photo-4.JPG

b2ap3_thumbnail_IMG_20130512_141749_459.jpg b2ap3_thumbnail_IMG_20130512_141540_690.jpg

This set of pictures shows again the level of commitment RRRG is investing in the rebuild of 50029 and 50030.  We intend 50030 to re-enter traffic by 2017 as effectively a brand new locomotive with fully overhauled internal parts and to ensure it a very long and secure future in preservation.  The same policy will be applied to 50029 when the time comes.

Continue reading
12615 Hits
1 Comment

The Peak Line for Microsoft Train Simulator price reduction!

The Peak Line for Microsoft Train Simulator price reduction!

For a limited period we have applied a promotional price discount to our highly-rated addon for Microsoft Train Simulator, The Peak Line.  This addon models the much-missed Ambergate - Matlock - Buxton/Chinley route as it was in the early 1960s just as diesel began to displace steam and you can now save £5 on the recommended retail price together with a further discount if you are an RRRG member!

Continue reading
110010 Hits
0 Comments

Rebuilt ETH KV10 completed

Rebuilt ETH KV10 completed

a1sx2_Resized_2013-06-04-11.59.08.jpg

We are pleased to announce that the first of our rebuilt KV10 electronic units has been completed.  As we reported in April, we placed an order for four rebuilt KV10 units, two per locomotive using modern electronic components as opposed to the obsolete 1960s versions of the original.  This picture shows a rebuilt CU6 ETH KV10; we have ordered two of these plus two rebuilt CU3 main generator units (the originals are identical to each other and are transformed into CU3 main generator or CU6 ETH generator KV10s by addition of a CU3A or CU6A daughter card but the rebuilt versions incorporate the electronics of the daughter cards into the main unit and so differ from each other).  The two photos above show both sides of the rebuilt unit's circuitry.  By way of a comparison, below is a view of the original 1960s vintage circuitry in the KV10.

a1sx2_Resized_KV10-old-circuitry-T-Snowball.jpg

The completion of the first rebuilt KV10 marks a further important stage in the restoration of 50029 Renown and 50030 Repulse.  The cost is just over £1000 per unit and we need the help of the enthusiast community to help us fund future stages in the restoration project.  Can you buy something from our online shop or consider joining RRRG and buying shares to become part of this exciting locomotive rebuild project?  We are keenly aware of the anticipation in the enthusiast community for 50029 and 50030 to haul trains once again but we are going to need your help to achieve this.

Continue reading
13195 Hits
0 Comments